Our experience
COMPLETED CONTRACTS
Design and execution of work for Task I: “Work on Railway Line No. 286 and in the area of Kłodzko Railway Station – Ścinawka Średnia Railway Station within the framework of the Project: “Safety Improvement and Operational Hazard Elimination on the Railway Network”

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: December 2019 – July 2021

Contract No.: 90/106/0166/19/Z/I

Scope of work:

  • Track and drainage work:
  • Engineering structures
  • Railway platforms and small-size structures
  • Electrical power engineering work
  • Railway traffic control system and telecommunications installation
  • Roadwork
  • Certification

Performance of modernisation work on Railway Line No. 7, Section Nałęczów – Lublin from 146.320 km to 175.850 km /initially Part C – section Dęblin – Lublin/ within the framework of the Project: “Work on Railway Line No. 7 Warszawa Wschodnia Osobowa – Dorohusk, Section Warsaw – Otwock – Dęblin – Lublin, Stage I”

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: March 2019 – October 2021

Contract No.: 90/101/0022/19/Z/I

Scope of work:

  • Track and drainage work:
  • Overhead traction line construction
  • Electrical power engineering work
  • Engineering structures
  • Foot crossings, vehicle crossings, roads
  • Railway platforms and small-size structures
  • Renovation of large-size structures
  • Sanitary networks
  • Hydrotech work
  • Tree work
  • Environmental protection installations
  • Certification
Design and execution of construction work in Rzeszów Główny Railway Station within the framework of the Project: “Improvement of technical condition of the passenger service infrastructure (including the adaptation thereof to the requirements of TSI PRM), Stage III Rzeszów Główny”

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: June 2018 – March 2021

Contract No.: 90/103/0048/18/I/I

Scope of work:

  • Drafting design documentation
  • Track and drainage work:
  • Railway traffic control system
  • Overhead traction line construction
  • Electrical power engineering work
  • Engineering structures
  • Foot crossings, vehicle crossings, roads
  • Railway platforms and small-size structures
  • Renovation of large-size structures
  • Sanitary networks
  • Certification

Development of design documentation and execution of construction works on its basis as part of the project “Works on railway lines no. 68, 565 on Lublin – Stalowa Wola Rozwadów section along with electrification”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: March 2017 – December 2020

Contract no.: 90/101/0013/17/Z/I

Scope of completed works:

  • Design documentation
  • Track and drainage works:
    • replacement of track structure along with cleaning of gravel
    •  cleaning of gravel and track adjustment
    •  track adjustment
    •  turnouts
    •  RTC and telecommunication engineering
  • Construction of overhead contact line system
  •  Electrical power engineering
  • Platforms and landscape architecture
  • Overhaul of buildings
  • Collisions
  • Certification

Drafting design documentation and execution of construction work within the framework of the Project: “Revitalisation of Railway Line No. 292, Section Jelcz Miłoszyce – Wrocław Sołtysowice for restoration of passenger transport in Wrocław Functional Area” – Part C Car parks

Contracting authority: Commune of Czernica

Contract term: November 2018 – October 2020

Contract No.: MTP-OZR.272.309.2018

Scope of work:

  • Design documentation
  • Surfaces made of concrete paving stones
  • Electrical power engineering work
  • Rainwater drainage system
  • Bicycle sheds
Improvement of quality of transport services on lines no. 31, 32, 36 as part of the CEF project “Works on E75 line on Sadowne – Białystok section along with remaining works on Warszawa Rembertów – Sadowne section”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: January 2017 – October 2017

Contract no.: 90/101/0117/16/Z/I

Scope of completed works:

  • Development of detailed designs, as-built documentation, obtaining administrative decisions
  • Removal of useless greenery after revitalization, trees and shrubs grubbing with their disposal
  • Execution of track works
  • Replacement of turnouts
  • Replacement of track structure within level crossings
  • Overhaul of engineering objects
  • Track works on turnouts
  • Works within RTC and automation industry
  • Works within power engineering industry
  • Certification
Execution of construction works at Przeworsk station, designing and execution of construction works at Jarosław station as part of the project entitled „Modernisation of railway line no. 91 Kraków Główny Osobowy – Medyka and line no. 92 Przemyśl – Medyka, Rzeszów – State Border section”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: May 2016 – June 2018

Contract no.: 90/103/0011/16/Z/I

Scope of completed works:

  • Execution of construction works at Przeworsk station including: track works, replacement of permanent way on turnout, construction of platform, reconstruction of engineering objects, overhead contact line system and electrical power engineering, telecommunication engineering and RTC
  • Development of design documentation and execution of construction works at Jarosław station, i.e. track works, construction of platform, electrical power engineering, telecommunication engineering and RTC

Modernisation of bridge on line no. 143 at Kluczbork station in km 69.749

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: June 2016 – October 2017

Contract no.: 90/106/0038/16/Z/I

Scope of completed works:

  • Modernisation of bridge on line no. 143 at Kluczbork station in km 69.749
  • Drainage works
  • Works within overhead contact line system
  • Electrical heating of turnouts
  • Demolition works
  • Telecommunication engineering
  • Track works
  • Replacement of turnouts
  • Installation of equipment within level crossings
  • Construction of temporary platform

Development of design documentation and execution of construction works, consisting in: A) construction of platform in Chmielów; B) elongation of platform in Głogów Małopolski; C) drainage of “kb” command box building in Kolbuszowa; D) demolition of platforms Widełka and Cmolas, as part of the investment project entitled: „Modernization of railway line Rzeszów – Warszawa through Kolbuszowa, Stage II”

Contracting Authority: PKP Polskie Linie S.A.

Time of completion: April 2016 – November 2016

Agreement no.: 90/103/0010/16/Z/I

Scope of completed works:

  • Development of design documentation
  • Construction of platform,
  • Elongation of platform,
  •  Drainage of control box building

Development of design documentation and execution of construction works associated with improvement of traffic safety at Przemyśl Bakończyce station as part of the investment project entitled: “Improvement of safety and elimination of operational hazards on railway network”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: March 2016 – October 2016

Agreement no.: 90/103/0008/16/Z/I

Scope of completed works:

  •  Replacement of permanent way along with accompanying works

Execution of construction works consisting in repair of Track No. 101 (wide track) at Medyka station, Line No. 92 Przemyśl – State Border

Contracting Authority: PKP Polskie Linie Kolejowe S.A. ul. Targowa 74, 03-734 Warszawa Railway Track Construction and Development Unit in Rzeszów

Time of completion: November 2015 – December 2015

Contract no.: 32/208/0052/15/Z/O

Scope of completed works:

  • Demolition works and rebuilding of track

Execution of construction works in project entitled: “Revitalization of access to platforms in terms of adaptation for disabled persons and persons with reduced mobility along with lighting system”

Contracting Authority: PKP Polskie Linie Kolejowe S.A. ul. Targowa 74, 03-734 Warszawa Railway Track Construction and Development Unit in Rzeszów

Time of completion: November 2015 – December 2015

Contract no.: 32/237/0008/15/Z/I

Scope of completed works:

  • Development of design documentation
  • Overhaul of access to platforms with adaptation for the needs of disabled persons on Rudnik Stróża, Rudnik nad Sanem, Łętownia, Nowa Sarzyna Kolonia, Jelna, Wierzawice, Tryncza, Gniewczyna, Lubaczów stops
  • Installation of lighting system for access to platforms on stops: Łętownia, Lubaczów, Rudnik Stróża

Revitalisation of Railway Line No. 131 Chorzów Batory – Tczew, Section Bydgoszcz Główna – Zduńska Wola – Chorzów Batory, Railway Track No. 2 Dąbie – Ponętów, Borysławice Junction Post and Dąbie Railway Station

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: May 2015 – December 2015

Contract No.: 90/107/0035/15/Z/I

Scope of work:

  • Drafting design documentation
  • Complete replacement of the rail surface together with restoration of the drainage system in Dąbie nad Nerem
  • Construction work on the route Dąbie nad Nerem – Ponętów, including complete replacement of the rail surface, drainage, repair of crossings, modernisation of bridges, redevelopment of culverts
  • Construction work on Borysławice Junction Post including the installation of turnouts
  • Automatic control-command and train operation robotics
  • Non-traction power engineering work
  • Overhead traction line

Designing and execution of construction-assembly works in the field of railway infrastructure as part of investment project: “Works on railway line no. 94 on Podbory Skawińskie – Przeciszów section”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: May 2015 – November 2015

Contract no.: 90/103/0016/15/Z/I

Scope of completed works:

  • Development of design documentation along with obtaining building permit for construction of steel bridge
  • Replacement of track structure along with replacement of track structure under the turn-outs
  • Construction of culverts
  • Certification

Construction of scanner along with accompanying infrastructure for scanning freight cars at railway border crossing in Terespol

Contracting Authority: Nuctech Warsaw Company Limited Sp. z o.o.

Time of completion: May 2015 – November 2015

Contract no.: NUCWS-2-15-016

Scope of completed works:

  • Construction of scanner operation building
  • Construction of curtain walls, accelerator room along with infrastructure and power supply
  • Land development
CONTRACTS IN PROGRESS
Extension of a rail siding at a container terminal, Stage II, in Kąty Wrocławskie

Contracting authority: Schavemaker Invest sp. z o.o.

Contract term: June 2023 to June 2024

Contract No.: 1/CEF/2023

Scope of work:

  • Track construction
  • Construction of the lighting system, electric point heating system and CCTV system
  • Extension and alteration of the water main system
  • Construction of a haulage road
  • Construction of perimeter fencing
  • Alteration of an MV line and conflicting power lines
Construction of the 110-kV line from the 110/20-kV Krzywa substation to the 110/20-kV Bolesławiec Tysiąclecia substation

Contracting authority: TAURON Dystrybucja Spółka Akcyjna

Contract term: March 2023 to March 2025

Contract No.: UM/TD-OLG/03674/04449/202

Scope of work:

  • Design work
  • Construction of a buried 110-kV line
  • Construction of a fibre-optic link from the 110/20-kV Krzywa substation to the 110/20-kV Bolesławiec Tysiąclecia substation
  • Construction of a 110-kV feeder bay at the BLT substation
  • Refurbishment of a 110-kV feeder bay at the SKR substation
Designing and performing construction works for the projects: “Construction of a new Aleksandrów passenger halt on railway line no. 30”, “Construction of a new Jaski passenger halt on railway line no. 30”, “Construction of a new Lisiowólka passenger halt on railway line no. 30”, “Refurbishment of the Bezwola passenger halt on railway line no. 30” and “Refurbishment of the Milanów passenger halt on railway line no. 30” under the “Government programme for the construction or refurbishment of railway halts for 2021–2025”

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: June 2018 – March 2021

Contract No.: 21/205/0001/23/W/I

Scope of work:

  • Design work
  • Demolition works
  • Platform construction
  • Landscaping
  • Track works
  • Electrical systems
  • Certification
Construction of an additional track crossover connecting tracks 2–4 (6) at Puławy Azoty station (km 117.44–117.56 LK 7) in connection with the project: “Works on railway line no. 7 from Warszawa Wschodnia Osobowa to Dorohusk at the Warszawa – Otwock – Dęblin – Lublin section”

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: July 2022 to September 2022

Contract No.: 90/101/0041/22/Z/I

Scope of work:

  • Dismantling
  • Earthworks
  • Track works
  • Overhead contact system
Power supply for the Katowice Airport in Pyrzowice at ul. Wolności” by way of open tender

Contracting authority: TAURON Dystrybucja Spółka Akcyjna

Contract term: February 2022 to February 2024

Contract No.: UM/TD-OBD/01912/05994/2022

Scope of work:

  • Construction of an MV 20-kV underground service connection from the GPZ Pyrzowice Lotnisko substation to the GPZ Pomłynie substation, including the replacement of an HV/MV transformer at the GPZ Pomłynie substation
  • Construction of the GPZ 110/20-kV Pyrzowice Lotnisko substation and alteration of the PZO Mierzęcice substation,
  • Construction of a section of the buried 110-kV power line from the GPZ Miasteczko substation to the GPZ Pyrzowice Lotnisko substation,
  • Construction of a buried 110-kV power grid from the GPZ Pyrzowice Lotnisko substation to the GPZ Siewierz substation and alteration of the buried 15-kV power grid from the PZO Mierzęcice substation to the GPZ Siewierz substation.
  • Implementation of the project and the handover of the facility to the client
Designing and performing works concerning the following job: “Comprehensive replacement of the overhead contact system on railway line no. 22, stage III”, implemented in connection with the project: “Works on railway lines no. 22 and no. 25 at the Gałkówek – Tomaszów Mazowiecki – Radom section and adjacent track links”

Contracting Authority: PKP Polskie Linie Kolejowe S.A.

Time of completion: November 2021 – October 2023 

Contract no.: 90/101/0064/21/Z/I 

Scope of completed works:

  • Comprehensive replacement of the overhead contact system on railway line no. 22, stage III
Development of executive design documentation and performance of construction work within the framework of the Project: “Revitalisation and restoration of the partially closed Railway Line No. 182 Tarnowskie Góry – Zawiercie”, implemented under OPI&E 2014-2020

Contracting authority: PKP Polskie Linie Kolejowe S.A.

Contract term: October 2020 – February 2023

Contract No.: 90/106/0077/20/Z/I

Scope of work:

  • Design documentation
  • Track and drainage work:
  • Overhead traction line construction
  • Electrical power engineering work
  • Railway traffic control system and telecommunications installation
  • Engineering structures
  • Foot crossings, vehicle crossings, roads
  • Railway platforms and small-size structures
  • Renovation of large-size structures
  • Sanitary networks
  • Certification