Design and execution of work for Task I: “Work on Railway Line No. 286 and in the area of Kłodzko Railway Station – Ścinawka Średnia Railway Station within the framework of the Project: “Safety Improvement and Operational Hazard Elimination on the Railway Network”
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: December 2019 – July 2021
Contract No.: 90/106/0166/19/Z/I
Scope of work:
Track and drainage work:
Engineering structures
Railway platforms and small-size structures
Electrical power engineering work
Railway traffic control system and telecommunications installation
Roadwork
Certification
Performance of modernisation work on Railway Line No. 7, Section Nałęczów – Lublin from 146.320 km to 175.850 km /initially Part C – section Dęblin – Lublin/ within the framework of the Project: “Work on Railway Line No. 7 Warszawa Wschodnia Osobowa – Dorohusk, Section Warsaw – Otwock – Dęblin – Lublin, Stage I”
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: March 2019 – October 2021
Contract No.: 90/101/0022/19/Z/I
Scope of work:
Track and drainage work:
Overhead traction line construction
Electrical power engineering work
Engineering structures
Foot crossings, vehicle crossings, roads
Railway platforms and small-size structures
Renovation of large-size structures
Sanitary networks
Hydrotech work
Tree work
Environmental protection installations
Certification
Design and execution of construction work in Rzeszów Główny Railway Station within the framework of the Project: “Improvement of technical condition of the passenger service infrastructure (including the adaptation thereof to the requirements of TSI PRM), Stage III Rzeszów Główny”
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: June 2018 – March 2021
Contract No.: 90/103/0048/18/I/I
Scope of work:
Drafting design documentation
Track and drainage work:
Railway traffic control system
Overhead traction line construction
Electrical power engineering work
Engineering structures
Foot crossings, vehicle crossings, roads
Railway platforms and small-size structures
Renovation of large-size structures
Sanitary networks
Certification
Development of design documentation and execution of construction works on its basis as part of the project “Works on railway lines no. 68, 565 on Lublin – Stalowa Wola Rozwadów section along with electrification”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: March 2017 – December 2020
Contract no.: 90/101/0013/17/Z/I
Scope of completed works:
Design documentation
Track and drainage works:
replacement of track structure along with cleaning of gravel
cleaning of gravel and track adjustment
track adjustment
turnouts
RTC and telecommunication engineering
Construction of overhead contact line system
Electrical power engineering
Platforms and landscape architecture
Overhaul of buildings
Collisions
Certification
Drafting design documentation and execution of construction work within the framework of the Project: “Revitalisation of Railway Line No. 292, Section Jelcz Miłoszyce – Wrocław Sołtysowice for restoration of passenger transport in Wrocław Functional Area” – Part C Car parks
Contracting authority: Commune of Czernica
Contract term: November 2018 – October 2020
Contract No.: MTP-OZR.272.309.2018
Scope of work:
Design documentation
Surfaces made of concrete paving stones
Electrical power engineering work
Rainwater drainage system
Bicycle sheds
Improvement of quality of transport services on lines no. 31, 32, 36 as part of the CEF project “Works on E75 line on Sadowne – Białystok section along with remaining works on Warszawa Rembertów – Sadowne section”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: January 2017 – October 2017
Contract no.: 90/101/0117/16/Z/I
Scope of completed works:
Development of detailed designs, as-built documentation, obtaining administrative decisions
Removal of useless greenery after revitalization, trees and shrubs grubbing with their disposal
Execution of track works
Replacement of turnouts
Replacement of track structure within level crossings
Overhaul of engineering objects
Track works on turnouts
Works within RTC and automation industry
Works within power engineering industry
Certification
Execution of construction works at Przeworsk station, designing and execution of construction works at Jarosław station as part of the project entitled „Modernisation of railway line no. 91 Kraków Główny Osobowy – Medyka and line no. 92 Przemyśl – Medyka, Rzeszów – State Border section”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: May 2016 – June 2018
Contract no.: 90/103/0011/16/Z/I
Scope of completed works:
Execution of construction works at Przeworsk station including: track works, replacement of permanent way on turnout, construction of platform, reconstruction of engineering objects, overhead contact line system and electrical power engineering, telecommunication engineering and RTC
Development of design documentation and execution of construction works at Jarosław station, i.e. track works, construction of platform, electrical power engineering, telecommunication engineering and RTC
Modernisation of bridge on line no. 143 at Kluczbork station in km 69.749
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: June 2016 – October 2017
Contract no.: 90/106/0038/16/Z/I
Scope of completed works:
Modernisation of bridge on line no. 143 at Kluczbork station in km 69.749
Drainage works
Works within overhead contact line system
Electrical heating of turnouts
Demolition works
Telecommunication engineering
Track works
Replacement of turnouts
Installation of equipment within level crossings
Construction of temporary platform
Development of design documentation and execution of construction works, consisting in: A) construction of platform in Chmielów; B) elongation of platform in Głogów Małopolski; C) drainage of “kb” command box building in Kolbuszowa; D) demolition of platforms Widełka and Cmolas, as part of the investment project entitled: „Modernization of railway line Rzeszów – Warszawa through Kolbuszowa, Stage II”
Contracting Authority: PKP Polskie Linie S.A.
Time of completion: April 2016 – November 2016
Agreement no.: 90/103/0010/16/Z/I
Scope of completed works:
Development of design documentation
Construction of platform,
Elongation of platform,
Drainage of control box building
Development of design documentation and execution of construction works associated with improvement of traffic safety at Przemyśl Bakończyce station as part of the investment project entitled: “Improvement of safety and elimination of operational hazards on railway network”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: March 2016 – October 2016
Agreement no.: 90/103/0008/16/Z/I
Scope of completed works:
Replacement of permanent way along with accompanying works
Execution of construction works consisting in repair of Track No. 101 (wide track) at Medyka station, Line No. 92 Przemyśl – State Border
Contracting Authority: PKP Polskie Linie Kolejowe S.A. ul. Targowa 74, 03-734 Warszawa Railway Track Construction and Development Unit in Rzeszów
Time of completion: November 2015 – December 2015
Contract no.: 32/208/0052/15/Z/O
Scope of completed works:
Demolition works and rebuilding of track
Execution of construction works in project entitled: “Revitalization of access to platforms in terms of adaptation for disabled persons and persons with reduced mobility along with lighting system”
Contracting Authority: PKP Polskie Linie Kolejowe S.A. ul. Targowa 74, 03-734 Warszawa Railway Track Construction and Development Unit in Rzeszów
Time of completion: November 2015 – December 2015
Contract no.: 32/237/0008/15/Z/I
Scope of completed works:
Development of design documentation
Overhaul of access to platforms with adaptation for the needs of disabled persons on Rudnik Stróża, Rudnik nad Sanem, Łętownia, Nowa Sarzyna Kolonia, Jelna, Wierzawice, Tryncza, Gniewczyna, Lubaczów stops
Installation of lighting system for access to platforms on stops: Łętownia, Lubaczów, Rudnik Stróża
Revitalisation of Railway Line No. 131 Chorzów Batory – Tczew, Section Bydgoszcz Główna – Zduńska Wola – Chorzów Batory, Railway Track No. 2 Dąbie – Ponętów, Borysławice Junction Post and Dąbie Railway Station
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: May 2015 – December 2015
Contract No.: 90/107/0035/15/Z/I
Scope of work:
Drafting design documentation
Complete replacement of the rail surface together with restoration of the drainage system in Dąbie nad Nerem
Construction work on the route Dąbie nad Nerem – Ponętów, including complete replacement of the rail surface, drainage, repair of crossings, modernisation of bridges, redevelopment of culverts
Construction work on Borysławice Junction Post including the installation of turnouts
Automatic control-command and train operation robotics
Non-traction power engineering work
Overhead traction line
Designing and execution of construction-assembly works in the field of railway infrastructure as part of investment project: “Works on railway line no. 94 on Podbory Skawińskie – Przeciszów section”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: May 2015 – November 2015
Contract no.: 90/103/0016/15/Z/I
Scope of completed works:
Development of design documentation along with obtaining building permit for construction of steel bridge
Replacement of track structure along with replacement of track structure under the turn-outs
Construction of culverts
Certification
Construction of scanner along with accompanying infrastructure for scanning freight cars at railway border crossing in Terespol
Contracting Authority: Nuctech Warsaw Company Limited Sp. z o.o.
Time of completion: May 2015 – November 2015
Contract no.: NUCWS-2-15-016
Scope of completed works:
Construction of scanner operation building
Construction of curtain walls, accelerator room along with infrastructure and power supply
Land development
CONTRACTS IN PROGRESS
Extension of a rail siding at a container terminal, Stage II, in Kąty Wrocławskie
Contracting authority: Schavemaker Invest sp. z o.o.
Contract term: June 2023 to June 2024
Contract No.: 1/CEF/2023
Scope of work:
Track construction
Construction of the lighting system, electric point heating system and CCTV system
Extension and alteration of the water main system
Construction of a haulage road
Construction of perimeter fencing
Alteration of an MV line and conflicting power lines
Construction of the 110-kV line from the 110/20-kV Krzywa substation to the 110/20-kV Bolesławiec Tysiąclecia substation
Construction of a fibre-optic link from the 110/20-kV Krzywa substation to the 110/20-kV Bolesławiec Tysiąclecia substation
Construction of a 110-kV feeder bay at the BLT substation
Refurbishment of a 110-kV feeder bay at the SKR substation
Designing and performing construction works for the projects: “Construction of a new Aleksandrów passenger halt on railway line no. 30”, “Construction of a new Jaski passenger halt on railway line no. 30”, “Construction of a new Lisiowólka passenger halt on railway line no. 30”, “Refurbishment of the Bezwola passenger halt on railway line no. 30” and “Refurbishment of the Milanów passenger halt on railway line no. 30” under the “Government programme for the construction or refurbishment of railway halts for 2021–2025”
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: June 2018 – March 2021
Contract No.: 21/205/0001/23/W/I
Scope of work:
Design work
Demolition works
Platform construction
Landscaping
Track works
Electrical systems
Certification
Construction of an additional track crossover connecting tracks 2–4 (6) at Puławy Azoty station (km 117.44–117.56 LK 7) in connection with the project: “Works on railway line no. 7 from Warszawa Wschodnia Osobowa to Dorohusk at the Warszawa – Otwock – Dęblin – Lublin section”
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: July 2022 to September 2022
Contract No.: 90/101/0041/22/Z/I
Scope of work:
Dismantling
Earthworks
Track works
Overhead contact system
Power supply for the Katowice Airport in Pyrzowice at ul. Wolności” by way of open tender
Construction of an MV 20-kV underground service connection from the GPZ Pyrzowice Lotnisko substation to the GPZ Pomłynie substation, including the replacement of an HV/MV transformer at the GPZ Pomłynie substation
Construction of the GPZ 110/20-kV Pyrzowice Lotnisko substation and alteration of the PZO Mierzęcice substation,
Construction of a section of the buried 110-kV power line from the GPZ Miasteczko substation to the GPZ Pyrzowice Lotnisko substation,
Construction of a buried 110-kV power grid from the GPZ Pyrzowice Lotnisko substation to the GPZ Siewierz substation and alteration of the buried 15-kV power grid from the PZO Mierzęcice substation to the GPZ Siewierz substation.
Implementation of the project and the handover of the facility to the client
Designing and performing works concerning the following job: “Comprehensive replacement of the overhead contact system on railway line no. 22, stage III”, implemented in connection with the project: “Works on railway lines no. 22 and no. 25 at the Gałkówek – Tomaszów Mazowiecki – Radom section and adjacent track links”
Contracting Authority: PKP Polskie Linie Kolejowe S.A.
Time of completion: November 2021 – October 2023
Contract no.: 90/101/0064/21/Z/I
Scope of completed works:
Comprehensive replacement of the overhead contact system on railway line no. 22, stage III
Development of executive design documentation and performance of construction work within the framework of the Project: “Revitalisation and restoration of the partially closed Railway Line No. 182 Tarnowskie Góry – Zawiercie”, implemented under OPI&E 2014-2020
Contracting authority: PKP Polskie Linie Kolejowe S.A.
Contract term: October 2020 – February 2023
Contract No.: 90/106/0077/20/Z/I
Scope of work:
Design documentation
Track and drainage work:
Overhead traction line construction
Electrical power engineering work
Railway traffic control system and telecommunications installation